Pekerjaan Manajemen Konstruksi Glycerolysis Tarjun

PT Tracon Industri Solusindo – PT Sinar Mas Agro Resources and Technology Tbk (SMART Tbk) Construction Management Services for Glycerolysis Tarjun PT Tracon Industri Solusindo was entrusted by PT Sinar Mas Agro Resources and Technology Tbk (SMART Tbk) to execute the Construction Management Services for the Glycerolysis Tarjun Project, a strategic initiative aimed at enhancing […]

Additional Certification for Construction Supervisory of Nawasena Project

Tracon Industri Solusindo provided additional certification services to strengthen the Construction Supervision scope of the Nawasena Project at Unilever Indonesia’s Jababeka facility. As Project Management Consultant (PMC), our team ensured that all supervisory personnel and construction oversight processes complied with Unilever’s strict FMCG standards, regulatory requirements, and industry best practices. This additional certification support enhanced […]

Wood Chip Factory Assessment di PT. Kertas Nusantara

Tracon Industri Solusindo conducted a comprehensive assessment of the Wood Chip Factory at PT Kertas Nusantara in Berau, East Kalimantan. The assessment focused on evaluating facility performance, equipment condition, material flow, and operational efficiency within the pulp and paper production chain. Through detailed inspections, technical analysis, and data-driven evaluation, our team identified improvement opportunities to […]

Pengadaan Jasa Detailed Engineering Design (DED) Interkoneksi Sumur KMJ-18 Ke Pl-405 PT PGE Area Kamojang, (Collective No.. S23TLP45006)

Tracon Industri Solusindo, through PT Daya Makara UI, delivered Detailed Engineering Design (DED) services for the interconnection of geothermal well KMJ-18 to PL-405 at PT Pertamina Geothermal Energy (PGE) Kamojang, West Java. The engineering scope included system design, route analysis, equipment specification, and integration planning to ensure a safe, efficient, and reliable interconnection within one […]

Pekerjaan Updating Desain Crushing Plant dan Infrastruktur di West Kalimantan Mine Development

Tracon Industri Solusindo carried out the comprehensive updating of the Crushing Plant and supporting infrastructure design for PT ANTAM Tbk’s West Kalimantan Mine Development. The work included technical reviews, redesign, and optimization of facility layouts, equipment configurations, and material-handling systems to ensure alignment with current operational requirements and mining best practices. Through detailed engineering evaluations […]

Jasa Konsultan Pembuatan Dokumen Studi Kelayakan (Feasibility Study) Project Recovery Dross Aluminium

Tracon Industri Solusindo provided consultancy services for the preparation of a comprehensive Feasibility Study (FS) for the Aluminium Dross Recovery Project of PT Nasional Hijau Lestari in Jakarta. The study evaluated technical processes, operational feasibility, environmental considerations, financial viability, and potential risks associated with developing a sustainable dross recovery facility. Through detailed analysis and structured […]

Jasa Auditor Energi

Tracon Industri Solusindo carried out Energy Audit services for PT Pupuk Indonesia (Persero), supported by detailed site surveys at two major fertilizer production facilities: PT Pupuk Sriwidjaja Palembang and PT Petrokimia Gresik. The audit focused on evaluating energy consumption patterns, equipment performance, process efficiency, and potential opportunities for optimization across critical production units. Through comprehensive […]

Project Management Consultant Instalasi 30 Unit System Proteksi Petir Eksternal di Kilang Pertamina International RU VI (Tahap II)

The collaboration between PT Tracon Industri Solusindo and PT Tracon Industri for the Pertamina International Refinery Unit VI (Phase II) project involves providing Project Management Consultant (PMC) services. The scope of work includes managing, supervising, and coordinating the installation project of 30 units of External Lightning Protection Systems at Pertamina International Refinery RU VI—Phase II.The […]