Tracon Industri Solusindo, through PT Daya Makara UI, delivered Detailed Engineering Design (DED) services for the interconnection of geothermal well KMJ-18 to PL-405 at PT Pertamina Geothermal Energy (PGE) Kamojang, West Java. The engineering scope included system design, route analysis, equipment specification, and integration planning to ensure a safe, efficient, and reliable interconnection within one of Indonesia’s most established geothermal fields.

By combining rigorous technical evaluation with geothermal best practices, our team produced a comprehensive design package that supports optimized steam management, operational continuity, and long-term asset performance. This project strengthens PGE Kamojang’s production infrastructure and contributes to advancing Indonesia’s renewable energy development.