PT Tracon Industri Solusindo – PT Unilever Indonesia Tbk

In 2025, PT Tracon Industri Solusindo was appointed by PT Unilever Indonesia Tbk to provide Additional Overtime Services as part of the Construction Supervisory Assistance for the Nawasena Project. This project involved the development of Unilever’s production facilities and supporting infrastructure, requiring intensive construction supervision, particularly during work carried out beyond normal working hours.

Scope of Work

In this assignment, Tracon Industri Solusindo was responsible for delivering professional support to ensure that all construction activities performed during overtime complied with safety, quality, and schedule expectations, including:

  1. Additional Construction Supervision During Overtime
    Providing expert personnel to monitor field activities during overtime, ensuring all construction work met Unilever’s standards and did not disrupt ongoing plant operations.

  2. Progress Monitoring & Technical Compliance
    Supervising structural, mechanical, electrical, and installation works conducted during extended hours to ensure full compliance with technical specifications and approved work methods.

  3. Safety Coordination (HSE Monitoring)
    Ensuring all overtime activities adhered to strict HSE protocols, including work area control, use of PPE, and risk mitigation within the project site.

  4. Overtime Progress Reporting
    Preparing daily reports detailing the work executed during overtime, field observations, and recommendations for follow-up actions to Unilever’s engineering and project management teams.

  5. Technical Support for Construction Issue Mitigation
    Providing rapid solutions for technical issues arising outside normal hours to prevent delays in the main project timeline.

Project Challenges

The project involved several challenges that required disciplined coordination, including:

  • Dynamic overtime scheduling tied to construction progress in the field.

  • Coordination among multiple contractors within a partially active operational area.

  • Higher safety enforcement requirements during nighttime and weekend overtime work.

  • Ensuring synchronized progress between regular working hours and overtime shifts.

Through consistent communication and continuous monitoring, Tracon ensured that all overtime construction activities were carried out safely and efficiently.

Project Outcomes & Impact

This service provided significant contributions to the timely completion of the Nawasena Project, including:

  • Acceleration of construction progress in line with Unilever’s project timeline.

  • Minimization of operational risks during overtime through strict HSE supervision.

  • Sustained work quality despite the extended working hours.

  • Enhanced coordination reliability between Unilever’s internal project teams and contractors.

The successful delivery of this overtime supervisory service further strengthened PT Tracon Industri Solusindo’s position as a reliable partner in construction monitoring for large-scale industrial projects.